How We Execute
- Make the Master Schedule to Include All Packages and All Aspects of Project
- Establish Critical Path
- Repeat the Process for Each Identified Packages (Sub Projects)
- Establish Monthly / Weekly Targets
- Collect and Feed Data
- Update Master Schedule- Project End Date
- Material
- Men
- Machine
- Money
- Technology When Called for
- Material
- Ensure Samples/ Proposals for the use of material Submitted as Scheduled
- Ensure Orders are placed as Scheduled for Long Delivery Items and Regularly for
- Items Consumed Daily
- Keep Tab on Quantity Received and Consumed
- Men
- Check Numbers Deployed
- Machinery Mobilized as Scheduled
- Keep Tab on their Individual Performance (Productivity)
- & Break Down
- Develop Project Specific Specification of Works
- Scrutiny Correctness & Adequacy of Specification of Works
- Specify Mandatory Tests and Frequency
- Specify Facilities for Field Laboratory
- Specify Approved List of Makes of Compatible Origin
- Specify Tolerances as Applicable
- Setup Field Lab with all Testing Facilities Prescribed
- Identify and Approve Out Side Agency (Laboratory)
- Conduct Tests of Material as Per the Frequency of Tests in the Specification
- Conduct all Site Inspection (Pre & Post) with the aid of Check Lists – Approve/Reject
- Record all Inspection Report on Quality and Preserve
- At Tender Stage Analyze Cost for Each Item and Determine Prime Cost to Act as
- Base Line for Tender Negotiation
- Work Out Quantities Correctly from Tender Drawings
- Work Out Bench Marking for Cost of a Module (A Particular Stage of Work)
- On Receiving GFC Drawings Work Out Quantities, Compare to that of Tender
- Drawings Act as the Revise Cost or Act Appropriately (Take Action to Reduce the
- Cost) as the Situation Demands
- At the Execution Stage Compile Data on Reaching the Predefined Stage
- Project Final Projected Cost
Our Projects
Upcoming & Completed Projects
-
YELLOW GINGER HOTEL
-
Status:
ONGOING
-
ALPHA ONE, NEXUS
-
Status:
ONGOING
-
LEMON TREE
-
Status:
ONGOING
-
PANORAMA (K.R. INFRA HEIGHT)
-
Status:
Ongoing
-
Marriott Resort & SPA
-
Status:
Ongoing
-
LEH-5 Star Category Property
-
Status:
Ongoing
-
Trilegal Corporate Office
-
Status:
Completed - Interior fit out works
-
Taj Theog Resort & SPA
-
Status:
Completed- Civil & Interior Works
-
Taj Harimahal
-
Status:
Completed - Complete renovation of Banquets, Meeting rooms and Restaurants
-
Central Mall,
-
Status:
Completed - ACP Works
-
Esplande Mall,
-
Status:
Completed-Civil & Interior works
Main Office
-
F-2/11, LGF, Malviya Nagar,
New Delhi, Pincode- 110017
-
+91-8368196274
-
vinod@temdistrikt.com
Head Office
-
D-21/1 Site-4,
Greater Noida -UP
-
+91-9910696092
-
temdistrikt@gmail.com
Copyright 2023 | The Engineering & Management Distrikt . All Right Reserved